References
Supply and Construction of Crane Track System, with SEPCO/SHB-5 in KSA
The King Salman international Complex for Maritime Industries and Services, or Maritime Yard Project (MYP) is a cornerstone of Saudi Arabia's ambitious "Vision 2030," a strategic framework aimed at reducing the country's dependence on oil, diversifying its economy, and developing public service sectors. The MYP is a collaborative effort between some of the world's leading entities in the maritime industry: Saudi Aramco, Hyundai Heavy Industries (HHI), Bahri, and Lamprell. This consortium brings together unparalleled expertise in oil production, shipbuilding, marine logistics, and offshore drilling platform construction.

Petrochemical Equipment Hoisting, with Sinopec Nanjing in KSA
The successful lifting of the heaviest piece of equipment, a tower scrubber, within the YANPET ethylene glycol renovation project in Saudi Arabia represents a significant milestone. This critical operation was executed by Sinopec Nanjing Engineering Company, with SINCHOLD playing an integral role in this endeavor. The flawless completion of this lift signifies not only the achievement of key project milestones but also underscores the expertise and collaboration between the involved parties.

Installation of Desulfurization and Denitrification Equipment, with Sinopec Nanjing in Baling
The relocation, upgrading, transformation, and development project of the caprolactam industry chain at Baling Petrochemical is a significant venture contracted by Sinopec Nanjing Engineering Company, with SINCHOLD playing a key role in the construction. This dual-point engineering project between Hunan Province and Sinopec aims to modernize and expand China's chemical manufacturing capabilities.

Track System and Metallurgical Equipment Installation, with Siemag AG
The hot rolled steel coil production line and intelligent steel coil handling and storage system at Formosa Plastics Fuxin Special Steel Mill represent a significant advancement in steel manufacturing technology. Contracted by the German engineering giant Siemag (part of the SMS Group), this project integrates cutting-edge equipment and automation to enhance efficiency, precision, and sustainability in steel production.

Supply and Installation of Steel Columns for Tram Overhaul, with CRCC in Colombia
In 2022-2023, Sinchold Ltd entered into a strategic partnership with CRMG (China Railway Materials Group, affiliated to CRCC) to undertake the Colombian Urban Tram Overhaul Workshop Project, a critical initiative aimed at modernizing urban transportation infrastructure. This collaboration was pivotal in enhancing the efficiency and reliability of tram maintenance facilities within Colombia's urban transit systems.

Steel Structure Works Construction - Wenzhou Taihan Solar Farm
The Wenzhou Taihan 550MW aquaculture-PV complementary Solar Plant, constructed on tidal land in Zhejiang, China, stands as the largest of its kind in Asia. This pioneering project, invested in and built by Astronergy/CHINT Solar, has recently been connected to the power grid, marking a significant milestone in renewable energy development. Upon its operation, the plant will boost the installed capacity of clean energy generation in the local power grid by approximately 26%.

Pipeline Installations - Changxing Island linking Chongming Island with Pudong
The Chongming Island - Changxing Island - Pudong New Area No. 5 Ditch LNG Station Pipeline Project stands as a monumental achievement in Shanghai's infrastructure development, significantly enhancing the city's energy security and distribution capabilities. This critical project, part of Shanghai's broader livelihood initiatives, has been meticulously planned over a decade and constructed over six years, reflecting the long-term commitment to improving the region's energy infrastructure.

Electromechanical Installations - New World Terminal
The Port of Nantong's New World Terminal #3-#4 Berth Renovation Project represents a significant upgrade to the region's maritime infrastructure, with a total investment of 1.39 billion yuan, including 400 million yuan dedicated to advanced equipment. This ambitious project utilizes 436.5 meters of shoreline to construct one 70,000-tonne and one 10,000-tonne berth, boasting a combined design throughput capacity of 7.749 million tonnes annually.

Hydropower Station Construction, with SinoHydro Corp
The Nam Theun 1 Hydropower Project, located in Laos, marks a significant milestone in the country's energy infrastructure development. Undertaken by China's leading engineering and construction company, Sinohydro Corporation, in 2019, Sinchold collaborated with Sinohydro on the construction of this hydropower station. During the construction process, Sinchold supplied the necessary track systems for heavy machinery operations, particularly crane rails along with their fasteners and accessories. These components are crucial for ensuring the safety and efficiency of heavy lifting activities during the assembly of the dam structure and other facilities.

Power Station Construction, with Siemens China
In 2017, Sinchold Ltd entered into a significant partnership with Siemens China Ltd to collaborate on the Black Point Power Station in Hong Kong, marking a pivotal moment in the advancement of the region's power generation capabilities. This collaboration was aimed at enhancing the efficiency and reliability of the power station, which is critical for meeting the growing energy demands of Hong Kong.